Tabulations and charts studying the relation between production and two factors: repair time and personal time. The report includes complete logs of personal time taken by the five operators in the relay assembly test room
Raw data regarding the effect of rest break variations on the daily output of 5 mica-splitting operators was measured over a 37-week period in 1928. Included are tables of the average accumulated totals, charts of output, and daily output logs for...
A proposed act granting a charter to John G. Farr to construct a tramway for the purpose of hauling logs, lumber, etc. Passed House October 31, 1889. Passed Senate and approved November 1, 1889.