Detailed daily descriptions of every variable adjusted in the relay assembly test room, including seating positions, methods to track production, temperature, humidity and lighting.
Interview method, analysis, and development of training began in the Inspection Branch, moved to the Operating Branch, and in January 1930 throughout the Works. A December 1929 pamphlet titled A Plan for Improving Employee Relations was printed. ...