Summary of weekly activity in the relay assembly test room from the time period August 8 through December 26, 1931. Production curve and other data fluctuations are covered and explained, as well as any personal or environmental effects on the test...
Report compiling data gathered from employee comments on standard hours and steady work during interviews held from 1929-1931. It also includes some information about home conditions which was collected during 1930-1931 and then grouped by mental...
Tables from a 1928 study that was started to test the length of time needed to gain efficiency in mica splitting. The weekly average output of 34 experienced operators was used as the standard. Fifty-two inexperienced operators were studied. ...
Unfinished rough draft that concentrates on determining under what conditions people perform their best work. Records were kept of each test employees amount of sleep, diet, attendance, comments, physical examinations, and earnings. The temperature...
Interview method, analysis, and development of training began in the Inspection Branch, moved to the Operating Branch, and in January 1930 throughout the Works. A December 1929 pamphlet titled A Plan for Improving Employee Relations was printed. ...