Detailed procedures for establishing the bank wiring test room, and selection criteria for the male workers in the test room group. Three reports on the subject of engineering study of human fatigue are included
Documents explaining the interviewing process that was used for the Hawthorne Study and include instructions on how to conduct the interviews along with the rating scales and evaluation terms to be used in observing and documenting their findings.
Two versions of an outline, the latter copy being a revision of the first, directing how to implement a new proposal to evaluate employee/employer relations. A Personnel Man would be introduced to the employees through their supervisor. The...
Interviews with the relay assembly test room operators to find out why there was low inspection efficiency. The observer concluded that talking did not delay production, but probably decreased concentration. The group had the tendency to go fast...
Schedule of test periods for the first relay assembly test room, including piece rates and converstion factors for relays assembled in the relay assembly test room.
Transcripts of interviews with operating branch employees concerning their working conditions and any other factors that may affect their work. Included at the end of each interview are brief notes from the interviewer
Step by step descriptions with diagrams of assembly of R-1498 relay. Includes stock list of parts required for assembly, and descriptions of motions required for each operator on assembly line, separated by hand.
Report written by Imogene Rousseau in February 1931. This report was based on the interviews that were conducted with twelve female operators who worked in the Landing Coil Department