|

To link to this object, paste this link in email, IM or document

To embed this object, paste this HTML in website

Personal records and correspondence: 1895. Contract between Albert B. Bellis of Muscogee and Green McCurtain for Mr. Bellis to build a windmill, install several exterior tanks and piping, several hydrants, a lawn sprinkler system, a sanitary water closet (toilet) in the bathroom in the house, and put a 40-gallon water boiler in the kitchen on Green McCurtains farm, dated August 3, 1895.

small (250x250 max)
medium (500x500 max)
large ( > 500x500)
Full Resolution
you wish to report:
Your comment:
Your Name:
...
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK