Two documents, both of which concern illumination studies, are presented. The first is a report on the illumination study at Hawthorne, which began Nov. 24, 1924 and ended April 30, 1927. In this study, candles of various lengths were introduced...
Schedule of test periods for the first relay assembly test room, including piece rates and converstion factors for relays assembled in the relay assembly test room.
Tabulations and charts studying the relation between production and two factors: repair time and personal time. The report includes complete logs of personal time taken by the five operators in the relay assembly test room
Examines the relation between the quality of output and the following factors: average hourly output, day of the week, weather, amount of sleep, and volume of conversation. Inspectors records of rejections were compared to the records of weather,...
Report on the quality of production by the relay assembly test room operators. A list of the 23 most frequent causes of rejection of relays was made. The inspector recorded each kind of defect, the hour of assembly, and the operator for each...
Record of observations of the relay assembly test room operations. Conversations of the workers were recorded in detail. Also recorded were observations of their moods, in handwritten marginalia
Record of observations of the relay assembly test room operations. Conversations of the workers were recorded in detail. Also included are observations of their moods in handwritten marginalia. During this period, several workers were informed...
Five interviews with the mica-splitting test room operators. The interview covered attitudes about the company and the test room. Family life and outside interests were also discussed